220 Oak Street Renewal – Exterior Details

Traduire vidéo
Pour traduire cette vidéo en anglais ou dans toute autre langue:
  1. Mettre en route la vidéo
  2. Cliquer sur l’icône « CC » (Sous-titre) en bas à droite
  3. Cliquer sur l’icône « Settings » (Paramètre) en bas à droite
  4. Cliquer sur «Subtitles » (Sous-titres)
  5. Cliquer sur « Auto-translate » (Traduire automatiquement)
  6. Sélectionner la langue de votre choix

220 Oak Street Renewal – Exterior Details

By Dimitrije Martinovic
Dimitrije is a staff member at FOCUS MEDIA ARTS CENTRE

220 Oak Street is a Toronto Community Housing (TCH) high rise apartment building located on the edge of Regent Park. It stands at 27 stories and was completed in 1972. The residents are comprised mostly low income families, single dwellers, seniors, young adults, unemployed people, students, and people with Physical and Mental health issues. The location has been identified as “one of TCH's most trouble addresses” (Betsy Powell, Toronto Star, Jan. 15, 2019).

Like many renewal and revitalization initiatives, the 220 Oak Street Renewal is  the result of a longer consultational process that involved tenant groups, TCH staff, and City of Toronto representatives. This process which kicked off 2019 formed what became “A Master Plan,” designed to address the following key areas: Installation of New Windows, Added Insulation, improving the Look and Feel of your Balcony, Enhanced Safety, Security and Keeping Pigeons Away, Improved Air Quality, Control Your Own Heat, and Upgrades to Plumbing and Hot Water.

A fall 2021 meeting was scheduled to discuss the final design details, but the coronavirus pandemic disrupted that event, and it was not until September 2022, that this next stage was resumed.

On a quiet September evening Adam Pelissero, Toronto Community Housing (TCH) Project Manager, and Sophie Tremblay of LGA Architectural Partners greeted residents with a sidewalk presentation of what some of the ideas and options that were being considered, and asked for input from those who had gathered to see what would be happening to the building.

Sophie Tremblay invited people to review the large format architectural renderings that depicted the before and after images of the common areas that will be renovated, and she went into further detail in her presentation on just what these changes might involve. Residents were genuinely curious and interested in the proposed plans.

The changes centred on the common areas like the building entrance and community all purpose room which is being reclaimed from what was once the building swimming pool. Most welcomed the changes, and as 220 Oak Street resident, Wendy said: “I really like the new park area here, I love the doggie park in the back, and I love all the new colours, and I just can't wait to see that new sample apartment, to see what it's going to look like inside with all the new changes, that's going to be really fun.”

Wrapping up the presentation Adam Pelissero stared that for TCH the main goal is to have the approval from the residents as what will go into the final decisions regarding all the changes.

 

Commentaires

Nous encourageons les commentaires qui favorisent le dialogue sur les histoires que nous publions. Les commentaires seront modérés et publiés s'ils respectent ces lignes directrices:

  • être respectueux
  • étayer votre opinion
  • ne violent pas les lois canadiennes, y compris, mais sans s'y limiter, la diffamation et la calomnie, le droit d'auteur
  • ne postez pas de commentaires haineux et abusifs ou tout commentaire qui rabaisse ou manque de respect aux autres.

Le portail des médias communautaires se réserve le droit de rejeter tout commentaire ne respectant pas ces normes minimales.

Ajouter un commentaire

CAPTCHA
Saisir les caractères affichés dans l'image.
Cette question sert à vérifier si vous êtes un visiteur humain ou non afin d'éviter les soumissions de pourriel (spam) automatisées.
Video Upload Date: September 30, 2022

Focus Media Arts (anciennement Regent Park Focus) est un organisme à but non lucratif qui a été créé en 1990 pour contrer les stéréotypes négatifs sur la communauté de Regent Park et fournir des interventions aux jeunes à haut risque vivant dans la région.

Nous sommes motivés par la conviction que les pratiques médiatiques participatives peuvent jouer un rôle vital pour répondre aux besoins locaux et aux priorités de développement, ainsi que pour soutenir le travail de construction et de maintien de communautés saines.

Aujourd'hui, le centre des arts médiatiques FOCUS sert de centre d'apprentissage communautaire pour les nouveaux médias, les arts numériques et la radiodiffusion et la télévision. Nous fournissons un établissement communautaire dédié à la formation et au mentorat des jeunes et à l'engagement des membres de la communauté de tous âges.

Ontario
-
Regent Park (TO)

Médias récents